The Kim Junior Suite – Fremont, CA

Status:
Completed
studio
1
320
ADU Type:
Junior ADU
Build Year:
2024
The Kims' four-bedroom home had one bedroom that never got used—the formal guest room that hosted visitors maybe twice a year. Converting it into a Junior ADU was the fastest, most affordable path to rental income. The 320 sq ft JADU was carved from the existing bedroom plus an adjacent hallway closet, staying within the home's original footprint. A new exterior door provides independent access from the side yard, while an interior door to the main house can be locked from both sides—rental privacy or family connection, depending on the need. The efficiency kitchen fits a two-burner cooktop, apartment-size fridge, microwave, and sink along one wall, with clever cabinet storage above and below. A compact bathroom with corner shower replaced what was a half-bath powder room. The main living space functions as bedroom and living room with a convertible sofa and wall-mounted desk. Total construction time: nine weeks. Total cost: under $85,000. Current tenant: a traveling nurse who needed something small, affordable, and move-in ready. The Kims barely notice she's there—except when the rent hits their account.
No items found.

Contact us

Get in touch with our team to start your ADU project. Whether you have questions about what's possible on your property or you're ready to begin the design process, we're here to help. Fill out the form and tell us about your goals.

We'll review your property, put together a cost estimate, and walk you through what comes next. Consultations are always free with no obligation.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

FLOOR PLAN

No items found.