The Torres Prefab - Santa Clara, CA
Status:
Completed

studio

1

450
ADU Type:
Prefab
Build Year:
2025
The Torres family didn't have six months to wait for traditional construction. Their daughter had just accepted a job in the Bay Area and needed somewhere to land while she saved for her own place. A prefab ADU solved the timeline problem. The 450 sq ft unit was factory-built in eight weeks, delivered on a flatbed truck, and craned into position in a single afternoon. Site prep, utility connections, and finishing took another three weeks, Start to move-in: under twelve weeks. Despite the speed, nothing feels prefab about the interior. Nine-foot ceilings, a full kitchen with waterfall-edge counters, and wide-plank engineered floors give the unit a permanence that surprises everyone who walks in. The bathroom's oversized tile shower rivals the main house, and a wraparound clerestory window band runs along the roofline, flooding the space with light while keeping sightlines private. Their daughter moved in on a Sunday. By Monday she was hosting friends and calling it home.
Contact us
Get in touch with our team to start your ADU project. Whether you have questions about what's possible on your property or you're ready to begin the design process, we're here to help. Fill out the form and tell us about your goals.
We'll review your property, put together a cost estimate, and walk you through what comes next. Consultations are always free with no obligation.
We'll review your property, put together a cost estimate, and walk you through what comes next. Consultations are always free with no obligation.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
FLOOR PLAN
No items found.




